Contact Us

AC Fan before installation tools ready

Date: 2016-7-18   Click: 1442 Times

"AC Fan" tools preparatory work before installation we can not say more, and other preparatory work by chapter is about the same way, the only difference is directly connected to the wind turbine installation site installation dimensions, as well as reserve installation size requirements is relatively high, the permissible error range is relatively small, foundation dimensions deviation should be within the range of ± 20mm, hollow center of each reserve size deviation should be ± 10mm between, so since we need the fan the size of each extra attention, the error is only installed to a minimum in order to make the fan installation more smoothly.

Back to: Industry news

+86-0769-83660708

Home Product News Contact

网站地图香蕉视频官网下载 香蕉视频在线免费观看 香蕉视频入口在线观看 香蕉视频破解版 妖精视频永久在线入口 香蕉视频911 香蕉视频IOS下载 羞羞视频网站入口 香蕉视频APP污 柠檬视频APP官网